Act 5 · HSE Officer
Inspection Route
Carlos Mendoza · 2026-03-04 · Permian Basin — All Pads · 5h 30m
Inspections Today
6
Passed
4
↑67%
Action Required
1
→follow-up
Due This Week
8
Inspection Route Map
1
bop test
Rattlesnake 17-1H (Active Drilling)
07:00
60 min
Last: 2026-02-25
pendingAnnular BOP function test
pendingRam BOP function test (blind/pipe)
pendingChoke manifold pressure test
pendingKill line pressure test
pendingAccumulator precharge pressure
pendingRemote BOP control panel check
2
flare check
Diamondback Pad Flare Stack
08:15
45 min
Last: 2026-02-18
pendingFlare pilot flame active
pendingFlare stack structural integrity
pendingCombustion efficiency (visual + meter)
pendingTCEQ flare permit current
pendingGas capture rate ≥ 95%
3
spill kitFOLLOW-UP
Sidewinder Pad Tank Battery
09:15
40 min
Last: 2026-02-20
pendingSpill kit inventory complete (absorbent, booms, PPE)
pendingSecondary containment berm integrity
pendingDrain valves closed and locked
pendingSPCC plan posted and current
pendingEmergency contact numbers visible
4
h2s monitor
Mustang Pad — Tank Gauging Area
10:10
50 min
Last: 2026-02-22
pendingFixed H2S monitors calibrated (bump test)
pendingPersonal H2S monitors issued to all personnel
pendingWind sock operational
pendingEvacuation route signs posted
pendingSCBA equipment inspection (2 units)
pendingH2S contingency plan current
5
tank environmentalFOLLOW-UP
Rattlesnake Pad — Secondary Containment
11:15
45 min
Last: 2026-02-15
pendingLiner integrity (visual for tears/punctures)
pendingContainment volume adequate (110% largest tank)
pendingNo standing fluids in containment
pendingLevel gauges and alarms functional
pendingRecent rainfall collection drained properly
6
wellhead safety valveURGENT
Diamondback 1-1H (High-Pressure Well)
12:15
50 min
Last: 2026-02-10
pendingSurface safety valve (SSV) function test
pendingSubsurface safety valve (SSSV) confirmed set
pendingWellhead pressure rated for max shut-in
pendingWing valve and master valve operation
pendingWellhead corrosion inspection
pendingESD (Emergency Shutdown) system test