PERMIAN BASIN RESOURCESDelaware Basin · Est. 2014
Interactive Demo
Act 5 · HSE Officer

Inspection Route

Carlos Mendoza · 2026-03-04 · Permian Basin — All Pads · 5h 30m

Inspections Today

6

Passed

4

67%

Action Required

1

follow-up

Due This Week

8

Inspection Route Map

107:00bop test60min208:15flare check45min309:15spill kit40min410:10h2s monitor50min511:15tank environmental45min612:15wellhead safety valve50min
1
bop test
Rattlesnake 17-1H (Active Drilling)
07:00
60 min
Last: 2026-02-25
pendingAnnular BOP function test
pendingRam BOP function test (blind/pipe)
pendingChoke manifold pressure test
pendingKill line pressure test
pendingAccumulator precharge pressure
pendingRemote BOP control panel check
2
flare check
Diamondback Pad Flare Stack
08:15
45 min
Last: 2026-02-18
pendingFlare pilot flame active
pendingFlare stack structural integrity
pendingCombustion efficiency (visual + meter)
pendingTCEQ flare permit current
pendingGas capture rate ≥ 95%
3
spill kitFOLLOW-UP
Sidewinder Pad Tank Battery
09:15
40 min
Last: 2026-02-20
pendingSpill kit inventory complete (absorbent, booms, PPE)
pendingSecondary containment berm integrity
pendingDrain valves closed and locked
pendingSPCC plan posted and current
pendingEmergency contact numbers visible
4
h2s monitor
Mustang Pad — Tank Gauging Area
10:10
50 min
Last: 2026-02-22
pendingFixed H2S monitors calibrated (bump test)
pendingPersonal H2S monitors issued to all personnel
pendingWind sock operational
pendingEvacuation route signs posted
pendingSCBA equipment inspection (2 units)
pendingH2S contingency plan current
5
tank environmentalFOLLOW-UP
Rattlesnake Pad — Secondary Containment
11:15
45 min
Last: 2026-02-15
pendingLiner integrity (visual for tears/punctures)
pendingContainment volume adequate (110% largest tank)
pendingNo standing fluids in containment
pendingLevel gauges and alarms functional
pendingRecent rainfall collection drained properly
6
wellhead safety valveURGENT
Diamondback 1-1H (High-Pressure Well)
12:15
50 min
Last: 2026-02-10
pendingSurface safety valve (SSV) function test
pendingSubsurface safety valve (SSSV) confirmed set
pendingWellhead pressure rated for max shut-in
pendingWing valve and master valve operation
pendingWellhead corrosion inspection
pendingESD (Emergency Shutdown) system test