SCADA Alarms
Real-time alarm monitoring · 60 wells · 52 SCADA-connected
Active Alarms
3
Acknowledged
12
Resolved Today
12
SCADA Alarm Feed
3 activeTubing pressure dropped 22 psi in 4 hours — possible parted rod or gas lock. Investigate flowline.
ESP motor temperature 285F — 15F above normal, trending up over 48 hours. Check VSD frequency.
Well shut-in due to high water cut (55%). Evaluate rod pump conversion or workover candidacy.
Production rate 8% below 7-day average. Rod pump may need stroke adjustment.
Tank #2 at 78% capacity — schedule hauler dispatch by Thursday to avoid overflow.
Water tank at 82% — hauler dispatch needed today. Production tanks within limits.
Well offline for planned ESP-to-rod-pump workover. Target completion Friday.
CO2 content 4.2% — corrosion inhibitor injection rate verified at target 1.8 gal/hr.
Well shut-in due to high water cut (58%). Candidate for P&A or sidetrack evaluation.
Scale inhibitor tank below 20% — refill scheduled on Jake's route today.
Flowing wellhead pressure 2,840 psi — new completion, monitoring flowback. Normal for IP phase.
Tubing pressure 2 psi below baseline — within variance. Monitor on next gauge round.
ESP running at 52 Hz — optimal for current inflow performance. No action required.
Casing pressure dropped 3 psi overnight. Within normal variance for rod-pump wells.
SCADA telemetry lost for 12 minutes at midnight — reconnected automatically. Possible cell signal.